Checklist for Concreting Excel Sheet
Floating and troweling is a process of compacting and smoothing the surface which is performed as the concrete is starting to harden. … Proper curing of concrete generally comes down to two factors, keeping it moist and keeping it supported. Hydration of cement, as the word itself implies, involves reaction with water.PROCEDURE FOR PLACING OF CONCRETE: Before any concrete is placed the entire placing programme consisting of equipment, layout, proposed procedures and methods is planned and no concrete is placed until formwork is inspected and found suitable for placement.Clear the area of any objects or material that would interfere in the pouring process. This includes grass, rocks, trees, shrubs, and even old concrete.
List of following reinforced before checked out following points given below:
Check surface preparation
Check for Form work and stagging
Conduits/ Ducts opening/ Insert Plates provided?
Check for provision of vibrators?
Working condition of mixer/ vibrators checked and gaps between plates
in mixer drum to be checked?
Access platform and walkways (if required) provided?
Check reinforcement as per drawings
Check Embedded parts
Check cover to Reinforcement
Check Plumb
Check Reduced levels
Check for Concrete (Pour card)