Description of Work

Earth work excavation

Sand filling for foundation/basement

P.C.C 1:5:10 mix for foundation , 40mm metal

R.C.C  1:2:4 for Beam, sunshade, loft,  roof, using tor steel rods

DUMMY CONCRETE 1:3:6

Centering & Scaffolding Work using tor steel rods & mild steel

Reinforcement Work

Brick work in c.m. 1:5  in foundation with chamber bricks

Brick work in c.m. 1:5 with chamber bricks for superstructure

Plastering for all walls C.M 1:5 mix, 12mm thick  thorouly inner &  outer

Plastering for ceiling in C.M 1:3 mix 10mm thick

Tiles flooring

Weathering course concrete

Weathering course tiles

White wash for Inner & Outer

colour wash for Inner & Outer

Doors & Windows

Electrical work

Plumbing  work

Septic tank   work

Bore work arrangements

Cupboard work arrangements

Grill works

Elevation item of work

Miscellaneous items of work

In case the funds avilable are less than the estimated cost the work is done in part or by reducing it or specifications are altered, the following require-ment are necessary for preparing an estimate.
a ) Drawings like plan, elevation and sections of important points.
b) Detailed specifications about workmenship & properties of materials etc.
c) Standard schedule of rates of the current year.

Note: cost of materials and labor charges varied just for sample, reference