Construction Articles

Standard Requirement In Respect of Building Construction Sites

Standard Requirement In Respect of Building Construction Sites

Damp Sites

Wherever the dampness of a site or the nature of the soil renders such precautions necessary,

the ground surface of the site between the walls of any building erected thereon shall be

rendered damp-proof to the satisfaction of the Authority.

Distance from Electric Line

The distance in accordance with the current electricity rules and its amendments from time to

time is to be provided between the building and overhead electric supply line.

Vertically Horizontally
a) Low and medium voltage

lines and service lines

2.50 m. 1.20 m
b) High voltage lines upto and including 11,000 volts 3.70 m. 1.20 m
c) High voltage lines above

11,000 volts and upto and

including 33,000 volts

3.70 m 2.00 m
d) Extra high voltage lines

additional 33,000 volts

Plus 0.3 mt for every

additional 33,000 V or part

thereof.

Plus 0.3 m for every

additional 33,000 V or part

thereof.

Minimum Size of Site

The minimum size of sites for the construction of different types of building or different use

groups, shall be in accordance with provisions of the Master Plan and any land development

Rules and Regulations of the Authority.

Ebook to Read Understanding Structural Engineering from Theory to Practice

Exit Requirements

General

The following general requirement shall apply to exits:

a) Every building meant for human occupancy shall be provided with exits sufficient to permit safe escape of occupants in case of fire or other emergency.

b) In every building exit shall comply with the minimum requirement of this part, except those not accessible for general public use.

c) All exists shall be free of obstructions.

d) No buildings shall be altered so as to reduce the number, width or portion of exits to less than required.

e) Exits shall be clearly visible and the routes to reach exits shall be clearly marked and signs posted to guide the occupants of floor concerned.

f) All exit ways shall be properly illuminated.

g) Fire fighting equipment where provided along exits shall be suitably located and clearly marked but must not obstruct the exit way and there should be clear indication about its location from either side of the exit way.

h) Alarm devices shall be installed to ensure prompt evacuation of the occupants concerned through the exits, wherever required.

i) All exits shall provide continuous means of egress to the exterior of a building or to an exterior open space leading to a street.

j) Exits shall be so arranged that they may be reached without passing through another occupied unit, except in the case of residential buildings.

See more Repairs and Seismic Strengthening of Buildings

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Follow Engineers

Civil Engineering Job Update in WhatsApp

click on the below link to join
Follow Now
close-link
error: Alert: Content selection is disabled!!
World’s Biggest Cruise Ship Construction Work Checklist Autocad 2d Plan with 3d Elevation