Gendral Civil Engineering

Important Things to be Followed Driven Cast-In-Situ Piles

Important Things to be Followed Driven Cast-In-Situ Piles   Plan movement of rig with respect to group of piles, Based on Priority of the Structure. Cross check the location of piles with reference points.(Survey) Check

Design Spreadsheets

Design of Pile Cap Excel Sheet

A pile cap is a thick concrete mat that rests on concrete or timber piles that have been driven into soft or unstable ground to provide a suitable stable foundation. It usually forms part of the foundation of a building,

Design Spreadsheets

DESIGN OF PILES BASED ON LOAD CAPACITY

Pile load capacity calculation is done to find the ultimate load the pile foundation can support when loaded. It is also known as the bearing capacity of piles. Pile load capacity calculation is done for

Design Spreadsheets

Checklist for Bored cast in-situ piles – Concreting

PILE CONCRETING The concrete placing shall not proceed if density of fluid near about the bottom of borehole exceeds 1250 kg/m3. Determination of the density of the drilling mud from the base of the borehole

Design Spreadsheets

Checklist for Bored cast in-situ piles – Reniforcement

REINFORCEMENT CAGE LOWERING Prefabricated reinforcement cage prepared as per the drawings and approved depths, is brought and kept near pile location while boring is in progress. After getting the permission from the engineer, the reinforcement