Conditions of Tender and Bills of Quantities
Construction Articles

Conditions of Tender and Bills of Quantities

Conditions of Tender and Bills of Quantities form part of the contract The tender must be signed by the tenderer. If the tender is submitted by a firm, it should be registered under the Indian

Design Spreadsheets

Calculate Quantities of Materials for Concrete

Quantities of materials for the production of required quantity of concrete of given mix proportions can be calculated by absolute volume method. This method is based on the principle that the volume of fully compacted

Design Spreadsheets

Construction Quantities of Materials Estimate

Construction Quantities of Materials Estimate for the production of required quantity of concrete of given mix proportions can be calculated by absolute volume method. This method is based on the principle that the volume of

Uncategorized

QUALITY CONTROL MEASURES

  Study duties responsibilities, Tender specification, standards, codes of practice and work instruction. Evolve effective acceptance/rejection procedures for constructionmaterials in coordination with the project purchase department. Do proper sampling and testing of steel, cement, concrete, aggregates,

Design Spreadsheets

Summary of Bill of Quantities (Civil Works)

A bill of quantities (BOQ) is a document used in tendering in the construction industry / supplies in which materials, parts, and labor (and their costs) are itemized.The bill of quantities (sometimes referred to as