Estimation and Costing

Labour Estimate for Various Items of Works

LABOUR ESTIMATE FOR VARIOUS ITEMS OF WORKS SN. ITEM DESCRIPTION QUANTITY  LABOUR ( 8 hours per day) 1. Concrete in Foundation. 10 m3 Head Mason 1/4, Mason 2, Labour 20 2. R.C.C. M – 15

Concrete Technology

Quantities of Materials Required for Plastering, Brickwork,Concreting

Quantities of Materials Required for Plastering, Brickwork,Concreting Consumptions for Plastering, Brickworks, Concreting Consumption of different materials of construction in the corresponding contract items of works shall  be computed on the basis of the quantities shown

Estimation and Costing

Estimate for proposed Residential Building

Estimate for proposed residential building   GROUND FLOOR Specification   EARTH WORK Earth work excavation up to 6′ depth digging of bore holes for soil stabilization   FILLING Supplying and filling with rier sand filling

Estimation and Costing

15 Important Points About Estimating

15 Important Points About Estimating   Before starting any estimate of building, road and bridge, it should be seen that the plans are fully dimensioned , inner and outer dimensions should be checked before starting

Estimation and Costing

Methods Of Calculations Of Quantities Of Materials

Methods Of Calculations Of Quantities Of Materials The calculations of quantities of materials can be done using various methods of  estimates. The application of an individual method depends upon the design and shape of  the

Estimation and Costing

Materials Needed To Build A House

Materials used in constructing a 1,700-square-foot, single family home. Here approximate quantity for building material to construction listed below: 9,726 board-feet of lumber 4,614 square feet of sheating, including roof, wall and floor sheating. 243